TIME STUDY BUNDLE
Without a measured standard time there is no costing, no plan and no controlling
Product cost, capacity plan, delivery date, bonus system and controlling all start from one number: how long one piece takes. If that number is estimated instead of measured, everything built on it is an estimate too.
What that means on Monday morning
- Quoting is done without a real unit cost, so you do not know what you earned until the job is over
- Planning cannot be done, deliveries slip, and you cannot give the customer a firm date
- Controlling sees the variance two months later, in the accounting report
- Pay for performance is not fair. People do not know what they get for doing more, so they hold back on purpose
Card or PayPal through Gumroad. The files download immediately and the receipt comes by email
What happens while the standard is not measured
Costing uses labour time per piece. If that time is estimated, the margin in your quote is estimated, so you either lose the job on price or run it below cost.
Capacity planning and delivery dates are calculated from standard time. Without it the planner enters numbers by feel, and the dates move during the week.
Controlling and budgeting have no baseline. The variance appears in accounting two months later, when nothing can be fixed any more.
Bonus and performance turn into an argument, because nobody knows where the number came from. Measuring without a method is worse: the operator sees the stopwatch, slows down, and you get data that is worth nothing.
Why this works in a real plant
You have no reason to trust someone you have never met, so here are checkable facts instead of promises.
A calculation you can check
Every number is derived from your own measurements and shows how it was obtained. Your engineer can repeat the whole procedure and verify it.
Eighteen years in plants
Food, metal, machining, electrical, chemical, textile, construction, defence and automotive industry (battery manufacturing), as an engineer, a manager and a production director.
You read it before you commit
Open the Excel file and read the manual first. If the system does not hold up in your plant, the money back guarantee applies.
Example from the manual, the numbers come from the Excel file you get
Manual assembly of a subassembly, one workbench, one operator, first shift.
- Existing standard in the company: 120 seconds per piece, that is 210 pieces per shift
- Measured: twelve valid cycles, range from 99.6 to 105.5 seconds
- Operator pace rating: 85 percent, basic company allowance: 9 percent, plus periodic work and working conditions
- Standard time after the calculation: 111.4 seconds, that is 226 pieces per shift
- Target of 80 percent for the first week: 181 pieces
The difference against the old standard is sixteen pieces per shift, and the standard is still fair, because breaks, shift handover and tool changes are covered by the allowances. That is the entire procedure, and it is visible on the sheet you get.
Measure one cycle, right here
Imagine you are standing at the machine. Press start, then LAP at the end of every cycle, at least five times. This is exactly what you do on the floor, only without the paper
How your standard time is built
Press start and measure, the structure is written from your own cycles
Observed time is not a standard. Only after you correct it by the rating and add the allowances do you get standard time. That is why two observers measuring the same operator get the same number only if they rate the pace the same way, and why the rating goes on the sheet, not in someone’s head
What an unknown standard costs you
Enter your own numbers. This is a rough estimate, not a promise. The real number comes only when you measure.
Inside the system
Screenshots of the Excel sheets you get, filled with demo data. These are not illustrations

How many operations you have, how many are measured, when the last study was done and how many actions are open.

Two series of fifteen cycles, rating, basic and special allowances, then standard time and pieces per hour.

The central register: what is measured, what is waiting, who owns it and when it was last updated.

Every finding from a study gets an action, an owner and a due date. Whatever is late turns red.

One sheet per operation, for printing. You take it into the plant and fill it in by hand.
The procedure, step by step
01 Preparation
You pick the operation, break it into elements and print the field sheet.
02 Measurement
Two series of fifteen cycles, always at the same breakpoint, stopwatch on LAP.
03 Rating and allowances
You rate the pace and add basic and special allowances from the table in the manual.
04 Result
Excel gives standard time, pieces per hour and per shift, and the target for the plan.
05 Defending the number
Master Experience walks you through the conversation with the shift when the number starts to be challenged.
06 Keeping it alive
The standard goes into the register, gets an owner and a date, and is reviewed whenever the process changes.
Two levels
Time Study system
- Excel system, twelve sheets
- Manual, 23 pages
- A4 field sheet, PDF and Word
- Checklist, 90 questions
The bundle
- Everything in the Time Study system
- Master Experience 01, 54 pages
- How to run a study without resistance
- How the standard survives when shifts change
Money back guarantee
Open the Excel file and read the manual. If the system does not show you at least one place where your standard does not hold, write to solutions@elcinsight.com within thirty days and you get your money back. No explanation and no form.
Buy the Time Study bundle
Payment goes through Gumroad, by card or PayPal. The files download the moment the payment goes through, and the receipt arrives by email. There is no subscription and no account to keep.
- Time Study system in Excel, twelve sheets, no macros
- Manual, 23 pages, the whole procedure step by step
- A4 field sheet in PDF and Word, ready to print
- Checklist with 90 questions
- Master Experience 01, 54 pages of practice
Instant download · card or PayPal · thirty day money back guarantee
Only the Excel part is $770, and Master Experience 01 on its own is $390. Both are in digital products.
Questions before you buy, or a purchase order from your company: write to solutions@elcinsight.com
Buying as a company, by bank transfer
If your company needs a proforma invoice and pays from the company account, order here instead. Price EUR 890.00, one payment. You receive a proforma invoice with your company details, and the files on the day the payment is recorded.
Something is blocking you, write and tell me where
Describe what stops your production or your deliveries. I answer personally, on your case, out of almost twenty years in real plants. No sales pitch and no phone calls.

- A personal answer within two working days
- One question per company
- What you write stays between us
Questions
Do I need any special software?
No. Excel and a stopwatch. The field sheet is printed and filled in by hand.
Are there macros in the Excel file?
None. A plain xlsx file, nothing to enable when you open it and nothing that can break.
How long until I set the first standard?
One afternoon for the first operation, with the manual next to you. Every next one is faster, because the procedure is the same.
Does this work outside manufacturing?
It works wherever the work repeats: packing, assembly, order picking, service, laboratory. It does not work for creative work that never repeats.
Can I take only the Excel part, without Master Experience?
Yes, that is the first level, $770. The bundle is cheaper if you take both.