EHS & LEAN Consulting
Instant download after payment  ·  PDF, 54 pages, fifteen chapters and three appendices

MASTER EXPERIENCE 01

The stopwatch is the easy part of work measurement

What is hard is everything around it: how you prepare the study, how you talk to the person at the workplace, what you do with stoppages and allowances, and how a standard time becomes a target that people accept instead of fight.

Where studies usually fail

  • The operator slows down the moment the stopwatch appears, and you write down a number that is worth nothing
  • Nobody explains what the study is for, so the shift reads it as preparation for layoffs
  • Stoppages are measured as work, and the standard carries the losses of the process forever
  • The number cannot be defended when the foreman asks where it came from, so it quietly dies
Master Experience 01, Work measurement
$390
one time · PDF, 54 pages · instant download
Buy Master Experience 01 See the bundle with the Excel system, $990

Card or PayPal through Gumroad. The file downloads immediately and the receipt comes by email

Eighteen years on the shop floor Textile, electrical, metal, food, machining, from hand packing to forging and CNC Money back guarantee
54pages
15chapters
3appendices
18years in plants

This is not a course and there is no theory in it

Everything in these pages happened in a plant. The sentences you say to an operator before the first cycle, the questions that open the truth about an operation, what you do when a machine stops in the middle of a series, and how you hand the standard over so that it still holds when the shift changes.

What is inside

Before the study

Why a company measures work at all, what a standard time is and what it is not, how you prepare the study, and how you explain to a person what it gives them.

At the workplace

When you measure and whom you measure, the conversation at the machine, the questions that open the truth, stoppages, 420 minutes and allowances.

After the number

Measuring at one breakpoint and the calculation, from standard time to the target, times between operations, and what you do once everything is measured.

The fifteen chapters

  • My approach to work measurement and why a company measures at all
  • Standard time is not a target, and why the two keep getting mixed up
  • Preparation before the study and how to explain it to the person
  • When you measure and whom you measure
  • The conversation at the workplace, the questions that open the truth
  • Stoppages, 420 minutes and allowances
  • Measuring at one breakpoint and the calculation
  • From standard time to the production target
  • Times between operations
  • Mistakes I keep seeing in plants
  • When everything is measured, what comes next
  • A short walk through the Excel Time Study system

The three appendices

  • Appendix A, the template for the one page flyer that answers the question every operator asks: what is in this for me
  • Appendix B, the checklist for the day of the study, so nothing is forgotten before you start the clock
  • Appendix C, the glossary, so your engineer, your planner and your foreman use the same words

Who it is for

For engineers and technologists who are going out to measure for the first time, for production managers who plan with those numbers, and for owners who want to know how a standard is built before they sign it.

Who it is not for: anyone looking for ready made time tables. Time is measured in your plant, in your conditions, on your machine.

Money back guarantee

Read it. If you do not find at least one thing you will do differently on your next study, write to solutions@elcinsight.com within thirty days and you get your money back. No explanation and no form.

Buy Master Experience 01

Payment goes through Gumroad, by card or PayPal. The file downloads the moment the payment goes through, and the receipt arrives by email.

$390
one time · PDF, 54 pages, fifteen chapters and three appendices
  • Everything that happens before and after the stopwatch
  • The conversation at the workplace, written out
  • Stoppages, allowances and the 420 minute shift
  • How the standard survives a change of shift
Buy for $390

Instant download · card or PayPal · thirty day money back guarantee

With the Excel Time Study system it is $990, and that bundle also carries the field sheet and the 90 question checklist: Time Study bundle

Buying as a company, by bank transfer

If your company needs a proforma invoice and pays from the company account, order here instead. Price EUR 330.00, one payment. You receive a proforma invoice with your company details, and the files on the day the payment is recorded.

Optional. I only call if something is unclear about your order.
Company name, address, VAT number and registration number. Sales to companies and sole traders only.
Free

Something is blocking you, write and tell me where

Describe what stops your production or your deliveries. I answer personally, on your case, out of almost twenty years in real plants. No sales pitch and no phone calls.

Nemanja Krstic
Nemanja KrstićEHS & LEAN Consulting, I answer you myself
  • A personal answer within two working days
  • One question per company
  • What you write stays between us
Write freely and concretely: what stops, how often, and what it costs you. The more you write, the sharper the answer.

Questions

Is this the same as the Time Study manual?

No. The manual explains how the Excel system works. Master Experience 01 is the practice around it: preparation, the conversation, stoppages, allowances, and how the number is defended.

Can I use it without the Excel system?

Yes. The procedure works with a stopwatch and a printed sheet. The Excel system only does the calculation faster and keeps the register of standards.

Does it work outside manufacturing?

It works wherever the work repeats: packing, assembly, order picking, service, laboratory. It does not work for creative work that never repeats.

What format is it?

PDF, 54 pages, A4, ready to read on screen or to print.

Master Experience 01  $390 Buy